BP will begin a new method to try to plug to the leak in the Gulf on Monday. The plan, which involves cutting pipe and installing a containment device, will raise the flow rate of oil gushing out of the sunken rig by 20 percent. – (AHN)
Read the original post by Twitter / GiveawayotDay